Frank R. Libsch, Takatoshi Tsujimura
Active Matrix Liquid Crystal Displays Technology and Applications 1997
The existence of a linear time approximation scheme for makespan minimization was demonstrated in the multiprocessor open shop problem with release dates. The approximation scheme was linear and didn't require solving linear program.
Frank R. Libsch, Takatoshi Tsujimura
Active Matrix Liquid Crystal Displays Technology and Applications 1997
Timothy J. Wiltshire, Joseph P. Kirk, et al.
SPIE Advanced Lithography 1998
Robert Manson Sawko, Malgorzata Zimon
SIAM/ASA JUQ
Ruixiong Tian, Zhe Xiang, et al.
Qinghua Daxue Xuebao/Journal of Tsinghua University