Alain Vaucher, Philippe Schwaller, et al.
AMLD EPFL 2022
We study the scheduling situation where n tasks, subjected to release dates and due dates, have to be scheduled on m parallel processors. We show that, when tasks have unit processing times and either require 1 or m processors simultaneously, the minimum maximal tardiness can be computed in polynomial time. Two algorithms are described. The first one is based on a linear programming formulation of the problem while the second one is a combinatorial algorithm. The complexity status of this "tall/small" task scheduling problem P|r i,p i = 1, size i ∈ {1, m}|T max was unknown before, even for two processors.
Alain Vaucher, Philippe Schwaller, et al.
AMLD EPFL 2022
Freddy Lécué, Jeff Z. Pan
IJCAI 2013
Michael Hersche, Mustafa Zeqiri, et al.
NeSy 2023
Susan L. Spraragen
International Conference on Design and Emotion 2010