Thomas R. Puzak, A. Hartstein, et al.
CF 2007
The preemptive job shop scheduling problem with two machines, with the objective to minimize the makespan is studied. An algorithm to find a schedule of length greater than the optimal schedule length is also discussed. The results showed that the maximum job length is bounded by a constant and algorithm finds a schedule whose length is within an additive constant of the optimal length.
Thomas R. Puzak, A. Hartstein, et al.
CF 2007
S.M. Sadjadi, S. Chen, et al.
TAPIA 2009
Yao Qi, Raja Das, et al.
ISSTA 2009
Michael C. McCord, Violetta Cavalli-Sforza
ACL 2007