Fernando Koch, Marcos Dias De Assuncao, et al.
IBM J. Res. Dev
The Resource Constrained Project Scheduling Problem (RCPSP) is the sub-class of the Scheduling Problem that deals with scenarios where personnel or workforce employed to perform the tasks are limited and each job has an arrival time, a due date, and a penalty associated to delays. In this article, we consider a special case of the RCPSP, which we will denote as the Resource Constrained Project Scheduling Problem with Bounded Multitasking (RCPSPBM), where human analysts are able to perform a limited number of tasks in parallel in exchange for cognitive overhead costs. We present a description of the problem and introduce an exact Mixed-Integer Linear Program formulation of the (RCPSPBM), used to evaluate the efficiency of (typically online) algorithms employed by dispatchers. © IFAC.
Fernando Koch, Marcos Dias De Assuncao, et al.
IBM J. Res. Dev
Fernando Koch, Marcos Dias De Assuncao, et al.
Future Generation Computer Systems
Marcos Dias De Assuncao, Carlos H. Cardonha, et al.
Future Generation Computer Systems
Priscilla Avegliano, Carlos H. Cardonha
WSC 2014